Mill Road - Ilford

New development situated in Ilford Town Centre.

The design of the building creates the look of three towers with the tallest standing at 25-storeys and sees the previously brownfield site transformed into a new town landmark. A total of 239 new build to rent homes have been created, including 77 affordable homes. Thought has been paid to sustainability with new green spaces including 32 new trees planted and 94 sq m of photovoltaics installed.

Mill Road CGI

Hazlemere are responsible for installing the RAL 7006 Matt Beige Grey aluminium windows and doors to compliment this large scheme that brings over 1000 new homes to the area. Those living on the upper levels will have stunning views across Central London. In fact it is only a 5 minute walk from the new Ilford Crossrail Station, and has excellent commuter roots on the door step. 

With the development due to launch in Q4 of 2025, Hazlemere were on site from summer 2024, with handover due spring of 2025. 

 

A big differentiation of this project was the predominantly off-site construction of Technal Soleal Next 75 windows into precast panels at the Techrete HQ in Brigg. The panels were then transported to the site in Ilford and craned into position. Hazlemere provided project management and site teams at both sites inline with our contractual obligations.

Place your project in the safest of hands

Give us a call if you’d like an expert opinion on your project plans, we’d love to hear from you.