Our Blog
Hazlemere Start 35th Trading Year
Hazlemere Windows Company Ltd was first established in April 1985, so in April 2020 will have been successfully trading for 35 years. April 2019 therefore sees the start of its 35th year of business having grown over the last 4 decades to become a significant employer in the region. Today the business operates out of
Constructionline Gold Awarded To Hazlemere Commercial
Having previously held Constructionline Silver, Hazlemere Commercial made a commitment not to stop until it was able to be awarded Constructionline Gold, which it was in March 2019. Constructionline work with over 10,000 buyers from nearly 4,000 organisations across the public and private sectors. Buyers use the Constructionline platform to quickly identify Suppliers that will
Hazlemere Commercial Awarded £1m Contract
Local developers, specialising in substantial mixed use new build projects have awarded Hazlemere Commercial a prestigious contract to survey, manufacture and install all the new aluminium windows and doors for one of the new mixed use blocks next to the Eden Centre in High Wycombe. The substantial development is on the old gasworks site smack
Aluminium Flush Casement Window Profiles Now Available
Building on the strength of the existing aluminium Crown Window range, Sapa Building Systems has launched its new Crown Flush Window Suite. With a variety of frame, vent, mullion and transom options for the creation of multiple window styles, the Crown Aluminium Window Suite now offers even greater design flexibility. With a consistent unbroken external
Burkes Court Beaconsfield Case Study
Burkes Court is a very interestingly shaped, multi-faceted mixed use commercial, retail and residential property less than 2 minutes’ walk to Beaconsfield Railways Station, and seconds away from comprehensive shopping facilities, many of which it accommodates at ground level. Following the renovation of the roof and the addition of thermally broken A energy rated aluminium
Backwell Secondary Academy Case Study
Backwell School joined the Lighthouse Schools Partnership Multi-Academy Trust in January 2018. The Trust includes both primary and secondary schools, including many other local primary schools. This means that Backwell School in Bristol can benefit both from improved continuity moving from primary to secondary school and sharing of best practice between teachers and learning professionals
GGF Recognise Hazlemere’s Health and Safety Standards
In partnership with both the glazing industry and the Health and Safety Executive (HSE) the Glass and Glazing Federation (GGF) launched the Glass Charter Merit Scheme with the aim of there being less accidents and safer working conditions in factories and on sites. The goal of the scheme is to measure improvement of those companies who
Still Family Owned Decades Later
When today’s Chairman Stuart Braham set up Hazlemere Window Company with his father George Braham and brother Ian Braham early in 1985, he could not have imagined that 34 years later that their family business would grow to become one of the region’s leading employers. Nowadays Hazlemere Commercial has a 56,000 square foot factory and
New Build Bucks School Project Completed
Having previously worked for Kier Construction at Octagon House in Portsmouth, Hazlemere Commercial were again appointed by Kier to fabricate and fit all the different coloured commercial aluminium windows and doors for the new build educational project at Green Ridge Primary Academy, set on the Berryfields Estate, north of Aylesbury in Buckinghamshire. Green Ridge staff and
The Importance of Maintaining Aluminium Fenestration Products
Aluminium windows and doors, like UPVC windows and doors, are often thought of as being relatively maintenance free double glazing products, and in the main they are, but just like with other products with moving parts, these elements do need to be maintained on a reasonably regular basis in order to a) ensure their continuous
Green Ridge Primary Academy Case Study
Green Ridge Primary Academy is set on the Berryfields Estate, north of Aylesbury in Bucks. The academy is located on a new housing development, and is the second primary school to be built within it’s vicinity to meet the demand for school places. The academy is initially a two-form entry school with capacity for 60
Burton and South Derbyshire College Case Study
In 2017, acting as Principal Contractors, Hazlemere Commercial completed a very sizeable total refurbishment project for Burton and South Derbyshire College. Given the significant changes that the new external fenestration design had to the original buildings, this project took many months of careful thought and involved careful logistical planning and execution. Hazlemere Commercial had an
Place your project in the safest of hands
Give us a call if you’d like an expert opinion on your project plans, we’d love to hear from you.