Our Blog

Forest School

Several phases of school refurbishment were undertaken on behalf of the client, Wokingham District Council, both in term time and during school holidays. Overall, the staged project occupied some three weeks in August 2005 and about three weeks in August and September 2006. The project involved two phases of replacing windows using the Architectonic Euroline

Read More »

Wellsmead Infant School

Working directly for Milton Keynes Council (Architecture MK) and the school, the complete replacement of all windows and doors within the complex was undertaken across term time and the school holidays. Although most of the critical work was undertaken during the summer closure period, completion had to be undertaken while the school was open. It

Read More »

Salesian College

Hazlemere Commercial worked directly with their client, Salesian College, in this project to replace the entire 2-storey elevation of the science block. Salesian College, is an independent Roman Catholic school in Farnborough, Hampshire, England. It admits boys from the age of 11 to 18, and girls in the Sixth Form. Undertaken entirely during the 2006 summer

Read More »

Hazelwick School Case Study

Hazlemere Commercial was selected to work with main contractor Croydon Project Services Ltd, to fabricate and install the fenestration requirements of Crawley District Council for Hazelwick School in Three Bridges, West Sussex. The project was a new-build learning resource centre on an established site. Incorporating two storeys of glazed curtain walling, faceted in order to

Read More »

Lord Grey School

Hazlemere Commercial was selected as the main contractor for this major project at Lord Grey School, working directly for Architecture MK (the architectural division of Milton Keynes). Lord Grey School opened in 1973 as a community comprehensive school following the amalgamation of Bletchley Grammar and Wilton Secondary schools. New accommodation was provided to supplement the

Read More »

Birchwood School

Hazlemere Commercial was selected to work with the main contractor, Ratcliffe & Burridge Ltd, on this prestigious contract for the Hertfordshire local authority. The work involved constructing a new-build three-storey lift shaft extension and stairwell from curtain walling. This was facetted in order to follow the designed building curve. The work was undertaken to a

Read More »

Wood End Nursery

Hazlemere Commercial was again selected by Milton Keynes Council to provide replacement windows and doors at one of their schools. The installation provided new ground floor windows and doors, and replacement roof-lights, throughout the entire school. The aesthetic appearance of the refurbished school was also further enhanced with replacement fascias and soffits. The work was

Read More »

Sir Herbert Leon Academy

Hazlemere Commercial added to its portfolio of school projects with the supply and installation of windows and doors as part of a mixed new build and refurbishment project at Leon School in Milton Keynes valued in excess of £5m. Hazlemere replaced the existing fenestration scheme throughout the school with Sapa’s casement windows and High Performance

Read More »
One of the new blocks at Bideford College in Devon

Bideford College

This award winning sustainability project used 100% re-cycled aluminium billet in the production of aluminium Sapa 55 and 75 casement windows. Hazlemere Commercial designed, manufactured and installed all the aluminium curtain wall, aluminium windows and commercial entrance doors for main contractors Morgan Sindall Group plc in conjunction with both the architect and Sapa Building Systems.

Read More »
Bucks County Offices Aylesbury

Bucks County Hall Replacement Windows Case Study

Hazlemere Commercial acting as a Principal Contractor, supplied & installed approximately 1,500 aluminium Sapa Building Systems Dualslide thermally broken vertically sliding windows (all with high performance solar glass) to a fully occupied 12 storey building. The replacement window programme was very necessary as the existing single glazed windows fitted when the offices were built in

Read More »

Merton Civic Centre Replacement Windows

Hazlemere Commercial has many years of experience with Sapa, Comar & Reynaers products, which they fabricate to client requirements in their own 38,000 square feet production facility on Cressex Business Park, in the outskirts of High Wycombe in Buckinghamshire. Hazlemere Commercial has rightly gained an enviable reputation with commercial  contracts like the £2.5m window refurbishment

Read More »

Place your project in the safest of hands

Give us a call if you’d like an expert opinion on your project plans, we’d love to hear from you.

Scroll to Top