Our Blog
Jumeirah Carlton Tower Hotel London
Working in a well known busy 5 star hotel in Central London requires careful planning and co-ordination to ensure that the primary function of the property is unaffected by the refurbishment schedule. As a consequence Hazlemere Commercial made sure that everything was agreed and arranged in advance, and then liaised closely with the Hotel Management
University of Westminster
The refurbished Marylebone Campus of the University of Westminster is home to the Faculty of Architecture and the Built Environment, as well as Westminster Business School. The Faculty of Architecture is one of the UK’s leading centres for the study of Architecture and the Built Environment, inspiring more than 2,000 students at its teaching base at
Epping Forest District Council Civic Offices – Phase One
Hazlemere Commercial undertook this project for Epping Forest District Council under the LHC framework, whereby clients have the knowledge that a pre-agreed schedule of rates will be adhered to by the LHC approved contractor, in this case Hazlemere Window Company Ltd. The windows were fitted into bespoke steel framework that Hazlemere Commercial designed and installed
London Borough of Morden – Civic Offices
Hazlemere Commercial acted as Principal Contractor on this substantial replacement fenestration project which involved the complete refurbishment of the external façade to a 14 storey tower building with a further two 2 storey wings. The project involved the replacement of approximately 2,000 fifty-three year old windows, cleaning of the external brickwork and mosaic tile façade,
Bucks County Council – County Offices
Hazlemere Commercial acting as a Principal Contractor, supplied & installed approximately 1,500 aluminium Sapa Building Systems Dualslide thermally broken vertically sliding windows (all with high performance solar glass) to a fully occupied 12 storey building. This was necessary as the existing single glazed windows fitted when the offices were built in the 1960s had deteriorated.”
Wycombe Wanderers Adams Park
Hazlemere Commercial was engaged as the fenestration sub-contractor to provide a continual run of windows and doors in a new single storey extension to the existing complex. Working to designs produced by HAP Architects, another local High Wycombe company, the framing had to match Wycombe Wanderers Football Club colours. The installation was also designed to
The Walled Garden
Featuring on Channel 4 television’s Grand Designs programme, this presented one of our most challenging projects to date. The architect designed property was unique in that it had linked decagon or part-decagon shapes forming the rooms, and the doors and windows featured a variety of shapes and angles. Working in partnership with the architect and
YMCA West London
Hazlemere Commercial was appointed as the Main Contractor to carry out replacement window works on the nine-story YMCA building in Hayes, West London. Although the building remained occupied throughout the work, inconvenience to the tenants was minimal. The contract involved replacing windows to the existing accommodation. The site is surrounded by busy roads and close-proximity
Cairngorm Close
Working for their client Inspace Partnership, who manage the maintenance contracts for Richmond upon Thames Churches Housing Trust, Hazlemere Commercial secured a £1,000,000 contract to replace windows throughout a number of their properties. Having completed Fulmer Close, attention then turned to Cairngorm Close – four blocks of residential apartments, two of which are situated over
Wycombe Marsh
Working with two national construction companies, initially with Birse Build and, during the later stages, with St James Plc, Hazlemere Commercial provided all fenestration requirements for this new-build residential development comprising 35 flats and 4 cottages. The project formed part of a major development on the outskirts of High Wycombe, as part of the District
Du Cane Court
Du Cane Court is a large 1930s built apartment block. Hazlemere Commercial’s client, Dorrington Investments Plc, commissioned an extensive refurbishment programme which relied on making survey and installation arrangements direct with individual tenants. Installation started in 2006 as a rolling maintenance programme, which continued into 2009, with some work extending beyond this as some tenants
Malmesbury Court
Acting as Principal Contractors for Housing 21 Housing Association Hazlemere Commercial’s brief was to undertake a complete facelift of all Malmesbury Court’s seventy one to two bedroom residences, covered walkways and communal areas. Hazlemere undertook a detailed consultation with all the residents and Housing 21, to select the best window profile design and operation for
Place your project in the safest of hands
Give us a call if you’d like an expert opinion on your project plans, we’d love to hear from you.