Thamesmead School Shepperton

Thamesmead School Appoint Hazlemere Commercial To Carry Out Phase 2 Of Their Replacement Window and Door Programme

Having previously been the Principal Contractors who carried out Phase One of Thamesmead School’s replacement windows and doors programme in 2015, Hazlemere Commercial are delighted to have again been appointed by this school in Shepperton, Surrey, to carry out Phase Two of Thamesmead’s replacement aluminium windows and doors programme, to upgrade the existing fenestration to more secure and more energy efficient thermally broken double glazing, which involved Hazlemere manufacturing and installing Sapa Dualframe 75 externally beaded aluminium windows and commercial aluminium entrance doors.

Thamesmead School’s Phase One’s contract value back in 2015 was £170,000 + VAT, whilst Phase Two’s 2018 order is for an additional £260,000 + VAT of replacement aluminium double glazed windows and doors. Phase Two also involves the fabrication and installation by Hazlemere Commercial of Sapa Elegance 52 aluminium curtain walling, more Sapa Dualframe 75 casement windows and Sapa Stormframe STII thermally broken commercial aluminium entrance doors.

Scroll to Top